|
Message/Author |
|
|
Is it possible in Mplus to run a 3-level path model where a Level 3 variable predicts a level 1 variable which in turn predicts a level 2 variable? Or, does the outcome need to be at level 1? |
|
|
Yes. You would have to have the Level 3 part (e.g. Level 3 mean) of the level 1 and level 2 variables and express their relationship on Level 3. |
|
Back to top |
|
|