|
Message/Author |
|
JM posted on Friday, June 05, 2009 - 6:30 am
|
|
|
Is it possible to run a parallel process model with one process having a multiple indicator structure (with two indicators per wave, four waves), and the other process being comprised of one indicator at each wave? |
|
|
Yes. |
|
Back to top |
|
|